Construction of 230 MW. Combined Cycle Thermal Power Plant 2

Two 70 T. Mobile Cranes at the construction of 230 MW. Combined Cycle Thermal Power Plant 2 in Gardabani.

☝️ Container Unloading:
🔷 Length: 22 m.
🔷 Width: 4 m.
🔷 Height: 3,62 m.
🔷 Weight: 50 t.

💥 Trust only Professionals to lift your Expensive Loads.

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com